Startseite

News

Produkte

Unternehmen

Referenzen

Historie

Service

Download

Kontakt

Impressum


Quick Steam Generator

Advantages
  • LSG-HP designed for minimum water content and quickest possible service availability
  • Small water content and low mass, combined with high heat transfer, enables full steam output and pressure to be raised in approximate 3-5 minutes from a start up
  • The saturated steam escape mostly free from residue water and dissolved salts
  • Instant saturated steam for process heating
  • Steam temperature measurement and alarm means protection of the evaporator spiral tube system against overheating
  • Measurement of the feed water inlet pressure on the feed water pump means protection against cavitations
  • 2- stage or modulating capacity control range
  • We are also able to offer customized capacity ranges
  • The system design guarantees free and easy access to the burner, instrumentation and facilities and good working condition for set up by commissioning and maintenance
  • The combustion chamber doesnąt contain any refractory. Therefore no heat storage in the combustion chamber and no uncontrolled after-evaporation in case of a quick capacity and/or an emergency shut down
back to the Application

You find further technical information on every type of heater in the Download Area of our Internet site.

Application/Advantages
Production/Equipment
Technical Data
P+I Diagram/Schema
LSG-Z DG AKHT-M NWK-HP NUK-HP THZ / GKV/H